Project:
DHL
Key Features:
Electrical upgrades, Active Loading Area.
Project Conditions:
Active Loading Area – requiring undisturbed operations.
Description:
New electrical service was required to be installed, requiring saw cutting, trenching, conduit placement and concrete through existing loading dock slab area as well as upgrade to adjacent rooms for new electrical service.